Skip to main content
Toggle site navigation
Menu
Description
Adds § 1.11.040 and Title 3; amends Ch. 1.09 and § 2.06.030; repeals and replaces §§ 1.01.010 through 1.01.030, 1.01.050, 1.03.010 and 1.07.010 through 1.07.040, sewer use
Disposition
Codified
Adoption Date
7/12/2022
Affecting
1.01.010, Adoption
(Repealed and replaced by § 1)
1.01.020, Title, citation, reference
(Repealed and replaced by § 1)
1.01.030, Copies of the code
(Repealed and replaced by § 1)
1.01.050, Headings, interpretation
(Repealed and replaced by § 1)
1.03.010, Definitions
(Repealed and replaced by § 2)
1.07.010, Penalty
(Repealed and replaced by § 3)
1.07.020, Non-exclusive, additional remedies
(Repealed and replaced by § 3)
1.07.030, Issuance of citations by designated district employees
(Repealed and replaced by § 3)
1.07.040, Right of entry
(Repealed and replaced by § 3)
1.09.010, Title
(Amended by § 4)
1.09.020, Purpose
(Amended by § 4)
1.09.030, Authority
(Amended by § 4)
1.09.040, Procedures – General
(Amended by § 4)
1.09.050, Procedures – Issuance of administrative citation(s)
(Amended by § 4)
1.09.060, Procedure – Contents of citation
(Amended by § 4)
1.09.070, Procedure – Appeal of administrative citation
(Amended by § 4)
1.09.080, Procedure – Appeal hearing
(Amended by § 4)
1.09.090, Fines assessed
(Amended by § 4)
1.09.100, Collection of fines
(Amended by § 4)
1.09.110, Other remedies
(Amended by § 4)
1.09.120, Administration
(Amended by § 4)
1.09.130, Severability
(Amended by § 4)
1.11.040, Enforcement cost recovery
(Added by § 5)
2.06.030, Responsibility for equipment on customer property
(Amended by § 6)
2.08.100, Sub-meters
(Added by § 7)
2.08.110, Landscape meters
(Added by § 7)
3.01.010, Adoption
(Added by § 8)
3.01.020, Title, citation, reference
(Added by § 8)
3.01.030, Ordinances and resolutions passed prior to adoption of the code
(Added by § 8)
3.01.040, Severability
(Added by § 8)
3.01.050, Court proceedings
(Added by § 8)
3.01.060, Purpose
(Added by § 8)
3.01.070, Definitions
(Added by § 8)
3.01.080, Sewer required
(Added by § 8)
3.01.090, Separate sewer
(Added by § 8)
3.01.100, Water connection required
(Added by § 8)
3.01.110, Permits and fees
(Added by § 8)
3.01.120, Occupancy prohibited
(Added by § 8)
3.01.130, Rates for service
(Added by § 8)
3.01.140, Standby assessment
(Added by § 8)
3.01.150, Service application, deposits, billing, collection and discontinuance of service
(Added by § 8)
3.01.160, Responsibility for equipment on customer property
(Added by § 8)
3.02.010, Public sewer not available
(Added by § 8)
3.02.020, Permit required
(Added by § 8)
3.02.030, Inspection required
(Added by § 8)
3.02.040, Design requirements
(Added by § 8)
3.02.050, Abandonment of facilities
(Added by § 8)
3.02.060, Cost of maintenance by owner
(Added by § 8)
3.02.070, Additional requirements
(Added by § 8)
3.02.080, Public nuisance
(Added by § 8)
3.02.090, Incorporation of ordinance no. 1 of 1963
(Added by § 8)
3.03.010, Lateral sewers
(Added by § 8)
3.03.020, Cost of lateral sewer
(Added by § 8)
3.03.030, Permit required
(Added by § 8)
3.03.040, Construction requirements
(Added by § 8)
3.03.050, Minimum size and slope
(Added by § 8)
3.03.060, Separate sewer
(Added by § 8)
3.03.070, Old building sewers
(Added by § 8)
3.03.080, Cleanouts
(Added by § 8)
3.03.090, Sewer too low
(Added by § 8)
3.03.100, Connection to public sewer
(Added by § 8)
3.03.110, Protection of excavation
(Added by § 8)
3.03.120, Maintenance of a side sewer
(Added by § 8)
3.03.130, Testing
(Added by § 8)
3.03.140, Application, contents
(Added by § 8)
3.03.150, Permit, departure
(Added by § 8)
3.03.160, Joints
(Added by § 8)
3.03.170, Maintenance of lateral sewer
(Added by § 8)
3.04.010, Permit required
(Added by § 8)
3.04.020, Plans, profiles and specifications required
(Added by § 8)
3.04.030, Subdivisions
(Added by § 8)
3.04.040, Easements or rights of way
(Added by § 8)
3.04.050, Persons authorized to perform work
(Added by § 8)
3.04.060, Compliance with local regulations
(Added by § 8)
3.04.070, Protection of excavation
(Added by § 8)
3.04.080, Design and construction standards
(Added by § 8)
3.04.090, Completion of sewer required
(Added by § 8)
3.04.100, Limitations on point of discharge
(Added by § 8)
3.04.110, Trucked or hauled waste
(Added by § 8)
3.04.120, Pretreatment/other regulations
(Added by § 8)
3.04.130, Measurements and tests
(Added by § 8)
3.04.140, Special arrangement agreements
(Added by § 8)
3.04.150, Swimming pools
(Added by § 8)
3.04.160, Applicability of standards and limits of this chapter – Conflicts with other regulations
(Added by § 8)
3.04.170, Regulation of waste received from other jurisdictions
(Added by § 8)