Skip to main content
Loading…
This section is included in your selections.

All measurements, tests and analysis of characteristics of Waste water and Waste made reference to in this Code or as determined to be necessary or required by the District, shall be done in accordance with standard practices and methods. Samples shall, when possible, be taken from the control manholes described herein. In the event that no such control manhole has been required or is available, then the samples shall be taken at the nearest downstream manhole in the Public Sewer to the point at which the Side Sewer is connected. The expense for said measurements, tests, and analysis, shall be done at the expense of the owner of the property. [Ord. 2022-2 § 8, 2022.]